Rural school with 51 children grade 1-5 from poor families and 5 teachers make use of the new facilities.
Realized, improved water and sanitation facilities:
Deeping 28 feet and 19 feet width and repairing abundant existing well with bricks, well cleaning, well cover, steel water tower with 1.000 lt tank, total pipeline system inside the school premises, construct 2 sink (1 unit has 4 taps), 3 tap points, construct 3 urinal building with total facilities, reconstruct 3 latrines, pump house, electric water pump, electrical panel board with cables, painted all our constructions, supplied water for staff quarters at the school.
Parents and children help: transport materials from gate to construction sites, digging and fixing for the pipeline.